Quote comparison lives in a shared Excel. Three buyers keep three versions. The award decision gets re-litigated on email.
Quotes land in one matrix with normalized currency, UoM, and terms. There is only one version of the truth.
Most enterprise procurement stacks were assembled one tool at a time — an RFQ portal, an AP scanner, a spreadsheet for vendor scorecards, a ticket queue for everything that didn’t fit. The result is a handoff-heavy workflow where every document is re-keyed and every supplier dispute becomes an archaeology project.
Procurement on ORDENTRA is one continuous line. RFQ to quote to award to receipt to match, all on one ledger, with the audit evidence captured at the moment of the event — not reconstructed after the quarter closes.
Quote comparison lives in a shared Excel. Three buyers keep three versions. The award decision gets re-litigated on email.
Quotes land in one matrix with normalized currency, UoM, and terms. There is only one version of the truth.
A partial delivery arrives at the dock at 7 am. It takes two days to reach AP. The invoice matches the PO but not the GRN.
Dock receipts capture the exception in place, and the three-way match engine reconciles the delta before payment.
Your three largest suppliers missed 14% of their SLAs last quarter. You have no way to hold them to the contract.
Vendor scorecards turn SLA credits into a line item. Corrective action plans trigger automatically below threshold.
No premium tier for three-way match. No separate SKU for vendor scorecards. Every capability lives in the base module.
Author, version, and dispatch RFQs to pre-qualified vendor lists in minutes. Line items, terms, and attachments inherit from the originating requisition so nothing gets re-typed.
Incoming quotes normalize to a single matrix with unit price, lead time, and payment terms. Currency and UoM conversions run in place.
Split awards by lot, by line, or by volume band. Award decisions are policy-gated and write straight through to PO and contract lifecycle.
Partial receipts, over-deliveries, and damaged-in-transit exceptions are captured at the loading dock with photo evidence and timestamp.
PO, GRN, and invoice reconcile automatically. Tolerances are configurable per commodity. Mismatches route to the right AP analyst with a reason code.
On-time delivery, quality defects, SLA adherence, and payment terms roll into a live supplier grade. Low scores trigger corrective action plans.
Procurement picks up where Order Management ends and feeds Inventory Control and OPEX Intelligence with the same canonical event stream.
A cleared requisition generates a pre-filled RFQ draft. The buyer selects vendors from a pre-qualified list, sets closing date and terms, and dispatches in a single action.
As vendors respond, quotes land in a single comparison view with unit price, total landed cost, lead time, and terms. Currency, UoM, and incoterms are normalized automatically.
The buyer splits the award by lot or volume band. The policy engine validates the split against savings, single-source limits, and vendor risk tier before the PO is issued.
Receiving clerks scan, photograph, and confirm line items at the loading dock. Partial deliveries, over-shipments, and damaged goods are captured in place with the correct exception code.
PO, GRN, and invoice match automatically within your configured tolerance. Mismatches are routed to the right AP analyst with the full evidence trail attached. Payment releases on terms.
Design targets for first production deployments. Measured outcomes land at GA, Q2 2026.
“Every CFO we talked to told us the same story: their AP team spent every week firefighting match exceptions, and every quarter watching SLA credits they were owed quietly disappear. Procurement on ORDENTRA is one ledger from RFQ to payment — so nothing has to be reconstructed, and nothing slips.”
Onboarding is designed as a single guided flow — KYC, tax forms, banking, certifications, and commodity pre-qualification all in one self-service journey. The target is under 15 minutes from invitation to first RFQ eligibility, and your procurement team only sees exceptions, not the happy path.
Each GRN is a first-class document, not an attribute on the PO. Receiving clerks capture partial quantities, over-shipments, and damaged lines in place. The three-way match engine reconciles the delta against the original PO and routes exceptions with reason codes — no line is ever stuck.
Yes. ORDENTRA is built to support 40+ operating currencies with daily central-bank rates or your treasury's contracted rate. RFQs, POs, and three-way match all execute in the vendor's native currency and convert to your book currency at the event of record, so FX noise never corrupts the audit trail.
Payments stay in your ERP. ORDENTRA is designed to emit a payment-ready event with the matched PO, GRN, and invoice stapled together, and push it into SAP, Oracle, NetSuite, or Dynamics via native connectors. Nothing is replicated. Your treasury workflow is unchanged.
A low score is designed to trigger a corrective action plan automatically. The supplier is notified, the commodity owner is CC'd, and future RFQs in that commodity route to alternate vendors until the score recovers. Repeat offenders move to a probationary tier that blocks split-award eligibility.
Every ORDENTRA module writes to a single operational data model. Read any module first — the others are already wired.
A 30-minute working session with a member of the ORDENTRA founding team. Bring your top-10 supplier list — we’ll load it into the scorecard engine during the call and walk the source-to-pay line end to end.